North Bank Footbridge with a smaller footbridge in the foreground
The North Bank Bridge, designed for pedestrians and
cyclists and funded by the American Recovery and
Reinvestment Act of 2009 (ARRA), is now under construction
over the MBTA Commuter Rail tracks which will connect North
Point Park with Paul Revere Park in Charlestown. The
expected completion of the bridge is mid-2012. Pedestrian
bridges are also planned over the Charles River from North
Point Park to Nashua Street Park in Boston, and over the
MBTA Commuter Rail tracks on the south bank of the river
from Nashua Street Park to the riverfront just upstream of
the Zakim Bridge south tower. These three stunning parks
along the Charles will then be linked together, and the
Charles River Reservation will finally be connected to
Boston Harbor.
Photo 32, May 2012